Astana Light Rail Phase I Steel Box Girder Project
Project type: Overseas light rail steel box girder construction
Location: Astana, Kazakhstan
Steel consumption: 3,109 tons
Construction period: December 2023 to December 2024
Zhonghengfeng participated in the Astana Light Rail Phase I steel box girder project in Kazakhstan. The project team addressed the construction difficulties of multi-curved spatial special-shaped steel structures and introduced TAKEL 3D modeling technology to support precise overseas steel structure delivery.
Astana Light Rail Phase I Station Steel Canopy Project
Project type: Overseas station steel canopy construction
Location: Astana, Kazakhstan
Scope: Steel canopies for five stations, 114-118
Steel consumption: 5,500 tons
Project period: Started in September 2024; completed and delivered in May 2026
The Astana Light Rail Phase I station canopy project required coordinated cross-border construction, simultaneous multi-station operation and difficult steel structure hoisting. Zhonghengfeng supported the overseas rail transit steel structure project with organized construction deployment and on-schedule delivery.
Almaty China-Kazakhstan Logistics Station Project
Project type: Overseas logistics park steel canopy construction
Location: Almaty, Kazakhstan
Scope: Logistics park canopy construction
Project period: Site team entered in early 2025; completed and put into operation at the end of 2025
Technical facts: BIM + 4D simulation technology; more than 50 special inspections and certifications
Zhonghengfeng was fully responsible for the logistics park canopy construction of the Almaty China-Kazakhstan Logistics Station. The project used BIM + 4D simulation to support efficient progress control, and its completion was reported by CCTV and other media as an example of cross-border engineering capability.
Laos Southern 1800MW Thermal Power Unit 1 Boiler Frame Project
Project type: Overseas thermal power steel structure equipment supply
Location: Southern Laos
Contract award: Won in March 2026 after multiple rounds of competitive bidding
Supply scope: 4,000 tons of steel structure equipment for the Unit 1 boiler frame
For the Southern Laos 1800MW clean and efficient power generation project, Zhonghengfeng is responsible for steel structure equipment used in the Unit 1 boiler frame. The contract reflects the company’s capability in steel structure equipment R&D, production and export for overseas power plant projects.