Typical Project Cases – Rail Transit
Typical project case – Rail transit section
Zhonghengfeng supports rail transit and high-speed railway station projects, including station buildings, platform canopies, column-free shelters, metal roofing and steel corridors. These selected cases are based on the latest 2026 company presentation.
Xiong’an Railway Station Station Building & Platform Engineering
Project type: High-speed railway station building and platform engineering
Location: Xiong’an New Area, China
Key project fact: The station building covers approximately 452,900 square meters.
Xiong’an Railway Station is one of the largest high-speed railway stations in Asia. Zhonghengfeng deeply participated in major works including the station building and platforms. The project required long-duration, high-intensity and multi-disciplinary coordination for a large national transportation hub.
Bozhou South Station Project of Shangqiu-Hefei-Hangzhou High-Speed Railway
Project type: High-speed railway station project
Location: Bozhou, Anhui Province, China
Bozhou South Railway Station is the first major station after the Shangqiu-Hefei-Hangzhou High-Speed Railway enters Anhui. During construction, the project team responded quickly and coordinated efficiently under high-risk, technically difficult and tight-schedule conditions.
Yan’an Station Column-Free Wind and Rain Shelter Steel Structure Project
Project type: Column-free shelter steel structure and metal roofing
Railway line: Xi’an-Yan’an Railway, Section XYZQ-13
Project period: Expansion and renovation construction started in 2023
Zhonghengfeng participated in the Yan’an Station expansion and renovation project, mainly undertaking steel structure works, metal roofing, static signage systems and electrical installation for the wind and rain shelter.
Xiyan High-Speed Railway Huangling Station Project
Project type: Spatial grid structure and metal roofing works
Railway line: Xi’an-Yan’an High-Speed Railway
Key project fact: Grid installation and metal roofing completed in 30 days.
Huangling Station uses a regular square pyramid spatial grid structure. In 2025, Zhonghengfeng completed the grid installation and metal roofing works in only 30 days, making Huangling Station the first completed high-speed railway station on the Xi’an-Yan’an High-Speed Railway line.
Yanjiao Station Building Expansion and Platform Canopy Project
Project type: Platform canopy steel frame structure
Railway line: Beijing-Tangshan Intercity Railway
Zhonghengfeng participated in the station building expansion and renovation project of Yanjiao Station, undertaking platform canopy construction. The project adopted a steel frame structural system with round steel columns.
Zhongwei South Railway Station Platform Canopy and Station Building Steel Structure Project
Project type: Platform canopy and station building steel structure
Location: Zhongwei, Ningxia, China
Key equipment: 650-ton crawler crane for heavy component installation
The project involved a large-scale platform canopy with high technical difficulty, unique steel structure shape and strict fabrication accuracy requirements. A 650-ton crawler crane was deployed to support safe and efficient high-altitude hoisting and heavy component installation.
Tianjin Binhai New Area Rail Transit Line Z4 Phase I North Section
Project type: Metro station metal roofing, steel corridors and ancillary works
Location: Tianjin Binhai New Area, China
Completion: Station construction tasks completed on schedule in November 2025
The project covers Lvchuangyuan Metro Station, Heshun Road Metro Station and Sino-Singapore Tianjin Eco-City Metro Station. Zhonghengfeng mainly undertook external metal roofing, steel structure connecting corridors and ancillary facility works.
Need steel structure support for a rail transit project?
Share your project location, drawings, station type, steel structure scope, applicable standards and delivery schedule. Zhonghengfeng can review the requirements and suggest the appropriate next step.