Main-Line Steel Box Girder Erection Began on Guangzhou Baiyun Municipal Lot 6

Crawler crane lifting a steel cross girder into position on Guangzhou Baiyun Municipal Lot 6.

The first main-line steel cross girder on Guangzhou Baiyun Municipal Lot 6 was placed on October 4, 2023. The lift marked the start of the lot’s steel box girder erection stage and demonstrated the planning, coordination and site controls required for complex work near a major transport hub.

First Steel Box Girder Installed for Guangzhou Baiyun Station’s Northwest Connection Platform

Project team at the Guangzhou Baiyun Station construction site beside a crawler crane and curved steel structure.

On June 18, 2023, the first steel box girder for the northwest connection platform at Guangzhou Baiyun Station was set in place. The operation opened an erection program involving curved geometry, constrained clearances and multiple contractors working across connected areas.

BIM Team Receives Source-Reported Recognition at Inner Mongolia Application Competition

Participants holding certificates at the Fourth Inner Mongolia BIM Application Competition results event.

A BIM model design team participated in the Fourth Inner Mongolia BIM Application Competition with work related to the SS-056 to SS-059 sections of Hohhot’s Bayannur Road improvement project. The historical source reports recognition but does not provide a verifiable award title or grade.