Typical Project Cases – Power & Coal Chemical

Typical project case – Power and coal chemical section

Zhonghengfeng supports power plant, green energy and coal chemical steel structure projects, including wind turbine hoisting, indirect air cooling towers, roof and wall systems, chemical plant steel frames and coal shed enclosure structures.

Gansu Qingyang green power aggregation pilot project wind turbine hoisting by Zhonghengfeng

Green Power Aggregation Pilot Project Wind Turbine Hoisting Project

Project type: Wind turbine hoisting and electrical installation inside the tower

Location: Qingyang, Gansu Province, China

Wind turbine type: 6.7MW all-steel tower

Key dimensions: Total turbine height 125 m, tower height 121 m and blade length 107 m

Project period: November 2025 to January 2026

Zhonghengfeng participated in Bid Section 3 of the Gansu Qingyang Green Power Aggregation Pilot Project. The construction and installation scope included wind turbine hoisting and electrical equipment installation inside the tower, requiring precise planning, technical control and efficient site organization.

Shaanxi Huangling Power Plant indirect air cooling tower steel structure project

Shaanxi Huangling Power Plant Indirect Air Cooling Tower Steel Structure Project

Project type: Power plant indirect air cooling tower steel structure works

Location: Huangling County, Yan’an City, Shaanxi Province, China

Project context: First million-kilowatt coal-fired generating unit project of Shaanxi Huangling Mining Industry

Scope: Concrete-filled steel tubular X-shaped columns and steel ring beams for Cooling Towers 1# and 2#

Key project fact: Two indirect air cooling towers, each 205 m high

In 2024, Zhonghengfeng was awarded the steel structure works for the indirect air cooling towers of Huangling Power Plant. During construction, the project team adopted H-beam temporary foundations instead of traditional concrete temporary supports, marking the company’s first application of this method in X-shaped column construction.

Xinjiang Oilfield Karamay 2640MW coal-fired power indirect air cooling tower steel structure project

Xinjiang Oilfield Karamay 2640MW Coal-fired Power Project

Project type: Coal-fired power project indirect air cooling tower steel structure works

Location: Karamay, Xinjiang, China

Project context: Coal-fired power section of the 2.64GW New Energy Integration Project Phase I of Xinjiang Oilfield

Scope: Concrete-filled steel tubular X-shaped pillars and steel ring beams for Tower 1 and Tower 2

Key project fact: Two 156 m indirect air cooling towers; single-tower installation cycle achieved under 13 days.

The Karamay project required fast-cycle installation under a tight construction schedule. Zhonghengfeng completed the air cooling tower steel structure works with strong construction organization and installation technology, setting a benchmark for similar indirect air cooling tower projects.

Jinchang 2x1000MW peak-regulation coal-fired power roof and wall system project

Jinchang 2x1000MW Peak-regulation Coal-fired Power Project Supporting the Hexi New Energy Base

Project type: Coal-fired power project roof and wall system works

Location: Jinchang, Gansu Province, China

Project context: Supporting facility for the Hexi New Energy Base

Scope: Roof system and wall system installation

Project period: September 2024 to June 2026

Zhonghengfeng participated in the Jinchang 2x1000MW peak-regulation coal-fired power project. The main structure adopted a concrete frame system, while the company’s construction and installation scope covered both roof and wall systems, supporting orderly progress of the power project.

Rongxin Chemical Circular Economy Demonstration Park ethylene glycol unit steel structure project

Rongxin Chemical Circular Economy Demonstration Park Project

Project type: Large-scale chemical steel structure installation

Location: Dalad Banner, Ordos City, Inner Mongolia, China

Scope: Steel structure construction for the ethylene glycol unit

Key installations: Dimethyl oxalate synthesis frame, DMO purification and water separation frame, ethylene glycol synthesis frame, and ethylene glycol separation and purification frame

Zhonghengfeng was responsible for related steel structure systems of the ethylene glycol unit in the Rongxin Chemical Circular Economy Demonstration Park. The project required experience in large-scale chemical steel structure construction and coordination across multiple process frames.

Jianyuan Coal Chemical coke oven gas to ethylene glycol steel structure project

Jianyuan Coal Chemical Technology Coke Oven Gas to 600,000 Tons/Year Ethylene Glycol Project

Project type: Coal chemical ethylene glycol project steel structure construction

Location: Etuoke Banner, Inner Mongolia, China

Owner / project company: Inner Mongolia Etuoke Banner Jianyuan Coal Chemical Technology Co., Ltd.

Designed capacity: 600,000 tons per year

Zhonghengfeng participated in the coke oven gas to ethylene glycol project of Jianyuan Coal Chemical Technology. During construction, the company adapted to actual site conditions, controlled construction nodes and optimized the construction plan while implementing quality and safety management requirements.

Guangxi Huayi methanol to olefins downstream deep processing steel structure supply project

Guangxi Huayi Methanol-to-Olefins and Downstream Deep Processing Integration Project

Project type: Energy chemical steel structure material supply

Location: Jingugu Area, Qinzhou Petrochemical Industrial Park, Guangxi, China

Supply scope: 14,500 tons of high-quality steel structures

Delivery fact: The full supply task was completed in only three months.

Zhonghengfeng supplied steel structures for Guangxi Huayi’s methanol-to-olefins and downstream deep processing integration project. The project highlights the company’s steel structure R&D, manufacturing quality and rapid supply capability for energy chemical projects.

Balongtu Coal Mine coal shed enclosure steel structure project in Ordos

Balongtu Coal Mine Coal Shed Enclosure Project

Project type: Coal shed enclosure steel structure works

Location: Dongsheng District, Ordos City, Inner Mongolia, China

Construction area: 30,000 square meters

Building scope: Four single buildings, each with a 40 m single span

Key project fact: Shed No.2 is a three-continuous-span structure with a 120 m span.

Zhonghengfeng participated in the coal shed enclosure project of Balongtu Coal Mine. The project team prepared scientific construction plans, optimized hoisting and installation methods, and controlled quality and safety to complete the coal shed steel structure works on schedule.

POWER AND COAL CHEMICAL STEEL STRUCTURES. ENGINEERED FOR COMPLEX SITES.

Need steel structure support for a power or chemical project?

Share your project type, drawings, structural scope, equipment loads, site conditions, coating requirements, applicable standards and delivery schedule. Zhonghengfeng can review the power or chemical steel structure requirements and suggest the appropriate next step.