{"id":1379,"date":"2021-10-23T23:47:00","date_gmt":"2021-10-24T07:47:00","guid":{"rendered":"https:\/\/zhfsteelgroup.com\/?p=1379"},"modified":"2026-10-22T00:34:57","modified_gmt":"2026-10-22T08:34:57","slug":"two-industrial-projects-concurrent-construction","status":"publish","type":"post","link":"https:\/\/zhfsteelgroup.com\/ar\/two-industrial-projects-concurrent-construction\/","title":{"rendered":"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update"},"content":{"rendered":"<p><!--\nSource URL: https:\/\/mp.weixin.qq.com\/s?__biz=Mzg4NTU1NzcyMg==&mid=2247488157&idx=1&sn=d5184bb47bccff5a5e9dfe7e405aafb6&chksm=cfa64228f8d1cb3e67f03c2bd7edf9bb507efac3d4f8bfaa9fb7dfd256af50eb919b9e974959&token=1957738421&lang=zh_CN#rd\nChinese listing ID: 107\nSource title: \u65b0\u7684\u91cc\u7a0b\u7891\nOriginal publication date: 2021-10-24\n--><\/p>\n<h1>Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update<\/h1>\n<p>In October 2021, Zhonghengfeng Group\u2019s original Chinese-language update recorded two industrial developments under construction at the same time: the Hebao Metal Materials project and the Wantai New Materials project. They are separate projects and should be understood, planned, and reviewed independently. This English account therefore avoids combining their schedules, deliverables, or responsibilities, and it does not characterize either project as evidence of a broader contracting capability.<\/p>\n<p>The source is a concise progress record rather than a complete contract dossier. It identifies concurrent construction and names the two projects, but it does not provide enough verified detail to publish quantities, completion percentages, contractual boundaries, client acceptance results, or final delivery dates. The most useful reading for engineering and procurement teams is consequently a disciplined one: two workstreams were active, and each required its own technical controls, document trail, and interface management.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/107-concurrent-industrial-projects-illustration.webp\" alt=\"Illustrative view of two separate industrial projects under construction\"><figcaption>Illustrative image representing two separate industrial projects under concurrent construction; it is not a photograph of the Hebao or Wantai project.<\/figcaption><\/figure>\n<h2>What the Source Establishes<\/h2>\n<div style=\"max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;\">\n<table style=\"width:100%;table-layout:fixed;overflow-wrap:anywhere;word-break:break-word;\">\n<thead>\n<tr>\n<th>Item<\/th>\n<th>Hebao Metal Materials project<\/th>\n<th>Wantai New Materials project<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Identity<\/td>\n<td>A separately named industrial project<\/td>\n<td>A separately named industrial project<\/td>\n<\/tr>\n<tr>\n<td>Status in the source<\/td>\n<td>Under construction when the update was published<\/td>\n<td>Under construction when the update was published<\/td>\n<\/tr>\n<tr>\n<td>Publication context<\/td>\n<td>Reported on 24 October 2021<\/td>\n<td>Reported on 24 October 2021<\/td>\n<\/tr>\n<tr>\n<td>Verified scope detail available<\/td>\n<td>Not specified in the source extract<\/td>\n<td>Not specified in the source extract<\/td>\n<\/tr>\n<tr>\n<td>Appropriate interpretation<\/td>\n<td>Manage as its own project and verify scope against contract documents<\/td>\n<td>Manage as its own project and verify scope against contract documents<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>This separation matters. Similar reporting dates do not mean that the two projects shared an owner, design basis, material specification, fabrication package, installation sequence, or acceptance criteria. Any commercial or technical comparison should begin with the governing documents for the relevant project.<\/p>\n<h2>Hebao Metal Materials: Keep the Package Definition Explicit<\/h2>\n<p>For the Hebao Metal Materials project, the source supports only the statement that construction was in progress. It does not state which disciplines, structures, buildings, or site activities were assigned to Zhonghengfeng. Accordingly, a procurement enquiry connected with this project should identify the package precisely before requesting a quotation or technical response.<\/p>\n<p>A practical enquiry would distinguish among design coordination, shop detailing, steel procurement, fabrication, surface treatment, delivery, erection support, or other services. It would also attach the latest drawings and specifications, define applicable codes, list inspection requirements, and state who owns each interface. These are ordinary controls for industrial construction, but they become especially important when a short public update does not describe the contract boundary.<\/p>\n<ul>\n<li>Use the project name and package number on every request, drawing transmittal, and material schedule.<\/li>\n<li>Confirm drawing revision status before material release or fabrication planning.<\/li>\n<li>Separate owner-supplied, contractor-supplied, and subcontractor-supplied items.<\/li>\n<li>Define hold points, witness points, documentation requirements, and acceptance authority.<\/li>\n<li>Record exclusions and dependencies rather than assuming they are included.<\/li>\n<\/ul>\n<h2>Wantai New Materials: Maintain an Independent Control Record<\/h2>\n<p>The Wantai New Materials project was also described as being under construction. That common status should not be used to merge it administratively with Hebao Metal Materials. Wantai should retain its own baseline, register of approved documents, procurement log, fabrication status, inspection records, shipment plan, and site issue list where these are applicable to the contracted work.<\/p>\n<p>For engineering teams, an independent record reduces the chance that a drawing, bill of materials, coating requirement, or inspection form from one project is applied to the other. For buyers, it supports correct purchase-order references, traceability, delivery destinations, and invoice reconciliation. For site teams, it clarifies which components and records belong to which receiving and installation sequence.<\/p>\n<h2>Engineering Controls for Concurrent Work<\/h2>\n<p>Concurrent projects create coordination pressure even when their technical scopes are unrelated. Resources such as detailing capacity, production slots, inspectors, lifting plans, transport windows, and site support may compete for attention. A controlled response is not to treat the projects as one program, but to use a consistent governance framework while preserving separate approvals and accountability.<\/p>\n<ol>\n<li><strong>Freeze information at defined gates.<\/strong> Release work only against approved inputs and clearly identified revisions.<\/li>\n<li><strong>Plan capacity by package.<\/strong> Match labor, equipment, inspection, and logistics to each project\u2019s actual release sequence.<\/li>\n<li><strong>Track constraints visibly.<\/strong> Maintain separate registers for missing data, technical queries, material availability, and site access.<\/li>\n<li><strong>Protect traceability.<\/strong> Link materials and fabricated items to the correct project, drawing, and inspection record.<\/li>\n<li><strong>Escalate interface decisions.<\/strong> Record who approved any change that affects cost, time, quality, or installation.<\/li>\n<\/ol>\n<p>These controls are presented as procurement and project-management guidance, not as claims about activities completed on either project. The source does not publish the underlying plans or records needed to verify implementation.<\/p>\n<h2>Procurement Value: Better Questions Before Award<\/h2>\n<p>For prospective clients or supply-chain partners, this update is most valuable as a prompt for due diligence. Before award, ask for a scope matrix that aligns deliverables with drawings, specifications, quantities, responsibilities, and acceptance records. Confirm the commercial basis for changes, the document format required at handover, and the process for resolving design or site queries.<\/p>\n<p>Where structural steel or related fabricated items are involved, the enquiry may also need grade and standard, connection assumptions, tolerances, welding and nondestructive-testing requirements, surface preparation, coating system, packing method, transport limitations, and erection interfaces. None of these technical particulars should be inferred from the brief 2021 article; they must be established for the package at hand.<\/p>\n<h2>A Factual Basis for Further Discussion<\/h2>\n<p>The October 2021 source records simultaneous activity on Hebao Metal Materials and Wantai New Materials. It does not establish a shared scope, a completion milestone, or an expansion into general contracting. Keeping those limits visible produces a clearer and more useful company news item: the projects are acknowledged, their identities remain distinct, and readers know what information must be verified before making engineering or purchasing decisions.<\/p>\n<p>To discuss a current industrial steelwork requirement, provide the project location, intended scope, design stage, target schedule, applicable standards, and available drawings through our <a href='\/ar\/contact-us\/'>contact page<\/a>. The project team can then review the enquiry against the actual documents rather than assumptions drawn from a historical update.<\/p>","protected":false},"excerpt":{"rendered":"<p>A source-based review of two industrial projects in concurrent construction: a scope-controlled project update.<\/p>","protected":false},"author":1,"featured_media":1359,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1],"tags":[155,17],"class_list":["post-1379","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","tag-company-news","tag-steel-fabrication"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update<\/title>\n<meta name=\"description\" content=\"Historical company record on two industrial projects in concurrent construction: a scope-controlled project update. Source claims are presented conservativ\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zhfsteelgroup.com\/ar\/two-industrial-projects-concurrent-construction\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update\" \/>\n<meta property=\"og:description\" content=\"Historical company record on two industrial projects in concurrent construction: a scope-controlled project update. Source claims are presented conservativ\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zhfsteelgroup.com\/ar\/two-industrial-projects-concurrent-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"Zhonghengfeng Steel Structure\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-24T07:47:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T08:34:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/107-concurrent-industrial-projects-illustration.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Li Tao\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"Li Tao\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/\"},\"author\":{\"name\":\"Li Tao\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\"},\"headline\":\"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update\",\"datePublished\":\"2021-10-24T07:47:00+00:00\",\"dateModified\":\"2026-10-22T08:34:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/\"},\"wordCount\":1017,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/107-concurrent-industrial-projects-illustration.webp\",\"keywords\":[\"Company News\",\"steel-fabrication\"],\"articleSection\":[\"Company News\"],\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/\",\"name\":\"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/107-concurrent-industrial-projects-illustration.webp\",\"datePublished\":\"2021-10-24T07:47:00+00:00\",\"dateModified\":\"2026-10-22T08:34:57+00:00\",\"description\":\"Historical company record on two industrial projects in concurrent construction: a scope-controlled project update. Source claims are presented conservativ\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/#primaryimage\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/107-concurrent-industrial-projects-illustration.webp\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/107-concurrent-industrial-projects-illustration.webp\",\"width\":1500,\"height\":1000,\"caption\":\"Illustrative image representing two separate industrial projects under concurrent construction; it is not a photograph of the Hebao or Wantai project.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/two-industrial-projects-concurrent-construction\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"name\":\"Zhonghengfeng Steel Structure\",\"description\":\"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.\",\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zhfsteelgroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\",\"name\":\"Zhong Heng Feng Building Group Co., Ltd.\",\"alternateName\":\"ZHF Group\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"width\":822,\"height\":709,\"caption\":\"Zhong Heng Feng Building Group Co., Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/zhonghengfeng-construction-group-co-ltd\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\",\"name\":\"Li Tao\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"caption\":\"Li Tao\"},\"description\":\"Steel Structure Expert, China.\",\"sameAs\":[\"http:\\\/\\\/zhfsteelgroup.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update","description":"Historical company record on two industrial projects in concurrent construction: a scope-controlled project update. Source claims are presented conservativ","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zhfsteelgroup.com\/ar\/two-industrial-projects-concurrent-construction\/","og_locale":"ar_AR","og_type":"article","og_title":"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update","og_description":"Historical company record on two industrial projects in concurrent construction: a scope-controlled project update. Source claims are presented conservativ","og_url":"https:\/\/zhfsteelgroup.com\/ar\/two-industrial-projects-concurrent-construction\/","og_site_name":"Zhonghengfeng Steel Structure","article_published_time":"2021-10-24T07:47:00+00:00","article_modified_time":"2026-10-22T08:34:57+00:00","og_image":[{"width":1500,"height":1000,"url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/107-concurrent-industrial-projects-illustration.webp","type":"image\/webp"}],"author":"Li Tao","twitter_card":"summary_large_image","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"Li Tao","\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"5 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/#article","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/"},"author":{"name":"Li Tao","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825"},"headline":"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update","datePublished":"2021-10-24T07:47:00+00:00","dateModified":"2026-10-22T08:34:57+00:00","mainEntityOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/"},"wordCount":1017,"commentCount":0,"publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/107-concurrent-industrial-projects-illustration.webp","keywords":["Company News","steel-fabrication"],"articleSection":["Company News"],"inLanguage":"ar","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/","url":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/","name":"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/#primaryimage"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/107-concurrent-industrial-projects-illustration.webp","datePublished":"2021-10-24T07:47:00+00:00","dateModified":"2026-10-22T08:34:57+00:00","description":"Historical company record on two industrial projects in concurrent construction: a scope-controlled project update. Source claims are presented conservativ","breadcrumb":{"@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/#primaryimage","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/107-concurrent-industrial-projects-illustration.webp","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/107-concurrent-industrial-projects-illustration.webp","width":1500,"height":1000,"caption":"Illustrative image representing two separate industrial projects under concurrent construction; it is not a photograph of the Hebao or Wantai project."},{"@type":"BreadcrumbList","@id":"https:\/\/zhfsteelgroup.com\/two-industrial-projects-concurrent-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/zhfsteelgroup.com\/"},{"@type":"ListItem","position":2,"name":"Two Industrial Projects in Concurrent Construction: A Scope-Controlled Project Update"}]},{"@type":"WebSite","@id":"https:\/\/zhfsteelgroup.com\/#website","url":"https:\/\/zhfsteelgroup.com\/","name":"Zhonghengfeng Steel Structure","description":"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.","publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zhfsteelgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/zhfsteelgroup.com\/#organization","name":"Zhong Heng Feng Building Group Co., Ltd.","alternateName":"ZHF Group","url":"https:\/\/zhfsteelgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","width":822,"height":709,"caption":"Zhong Heng Feng Building Group Co., Ltd."},"image":{"@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/zhonghengfeng-construction-group-co-ltd\/"]},{"@type":"Person","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825","name":"\u0644\u064a \u062a\u0627\u0648","image":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","caption":"Li Tao"},"description":"Steel Structure Expert, China.","sameAs":["http:\/\/zhfsteelgroup.com"]}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/107-concurrent-industrial-projects-illustration.webp","_links":{"self":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1379","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/comments?post=1379"}],"version-history":[{"count":1,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1379\/revisions"}],"predecessor-version":[{"id":1399,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1379\/revisions\/1399"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media\/1359"}],"wp:attachment":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media?parent=1379"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/categories?post=1379"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/tags?post=1379"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}