{"id":1371,"date":"2021-12-03T22:16:00","date_gmt":"2021-12-04T06:16:00","guid":{"rendered":"https:\/\/zhfsteelgroup.com\/?p=1371"},"modified":"2026-10-22T00:34:19","modified_gmt":"2026-10-22T08:34:19","slug":"jingao-project-multi-plant-fabrication-coordination","status":"publish","type":"post","link":"https:\/\/zhfsteelgroup.com\/ar\/jingao-project-multi-plant-fabrication-coordination\/","title":{"rendered":"Multi-Plant Fabrication Coordination for the Jing\u2019ao Project"},"content":{"rendered":"<p><!-- Source URL: https:\/\/mp.weixin.qq.com\/s?__biz=Mzg4NTU1NzcyMg==&mid=2247488353&idx=1&sn=84562416bd355c0f520d922041651b29&chksm=cfa643d4f8d1cac2ee6bfb08e121d62308d04cdf0a6ceea740502e7a1b15b784a2d193f21adb&token=439267444&lang=zh_CN#rd\nChinese listing ID: 116\nSource title: \u201c\u6676\u6fb3\u201d\u9879\u76ee\u662f\u4e2d\u6052\u4e30\u5404\u5927\u52a0\u5de5\u5382\u65e5\u591c\u517c\u7a0b\u9f50\u529b\u5b8c\u6210\u7684\u9879\u76ee\u4e4b\u4e00\nOriginal publication date: 2021-12-04T14:16+08:00 --><\/p>\n<p>A company update published on December 4, 2021 described production coordination among Zhonghengfeng processing plants for a project identified in the source as the \u201cJing\u2019ao project.\u201d The source imagery also carried a caption describing transport of a component reported to be 28 metres long. This English account retains the project name and company scope as stated by the source: coordinated production across multiple processing plants. It does not broaden that scope to design, installation, project completion, or overall project performance.<\/p>\n<h2>Coordinating Work Across Multiple Plants<\/h2>\n<p>Dividing fabrication among facilities can add capacity or align particular processes with available equipment, but it also creates interfaces. Drawing revisions, material identification, welding requirements, dimensional references, surface treatment, packing, and release status must remain consistent when work moves through different production teams. A common control plan helps each plant understand what it owns and what information must accompany its output.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/jingao-steel-fabrication-welding.webp\" alt=\"Multiple workers welding large steel components in a fabrication workshop\"><figcaption>Source photograph of multiple welding stations operating in a steel fabrication workshop during work associated by the source with the Jing&#8217;ao project.<\/figcaption><\/figure>\n<p>The original article\u2019s significance lies in this coordination theme. It records collaborative production activity, not a basis for claims about round-the-clock work, exceptional individual rankings, or the entire project\u2019s delivery. Those promotional formulations have been removed. The useful engineering question is how distributed production is managed so that components made in different locations fit the same contractual and technical framework.<\/p>\n<h2>Key Interfaces for Distributed Fabrication<\/h2>\n<div style=\"max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;\">\n<table style=\"width:100%;table-layout:fixed;overflow-wrap:anywhere;word-break:break-word;\">\n<thead>\n<tr>\n<th>Interface<\/th>\n<th>Coordination need<\/th>\n<th>Evidence for review<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Technical information<\/td>\n<td>Common drawing and specification revision status<\/td>\n<td>Controlled transmittals and revision register<\/td>\n<\/tr>\n<tr>\n<td>Material<\/td>\n<td>Consistent identification and traceability rules<\/td>\n<td>Certificates, heat mapping, receiving records<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0644\u062d\u0627\u0645<\/td>\n<td>Applicable procedures, qualifications, and inspection points<\/td>\n<td>WPS\/PQR references, welder records, weld maps<\/td>\n<\/tr>\n<tr>\n<td>Dimensions<\/td>\n<td>Shared datums, tolerances, and trial-fit strategy where required<\/td>\n<td>Inspection reports and survey records<\/td>\n<\/tr>\n<tr>\n<td>Release<\/td>\n<td>Clear status before coating, packing, or dispatch<\/td>\n<td>Hold-point sign-off and release note<\/td>\n<\/tr>\n<tr>\n<td>Logistics<\/td>\n<td>Alignment of component geometry, route, handling, and sequence<\/td>\n<td>Load plan, route review, permits where applicable<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>These are recommended review areas rather than a list of source-verified project documents. A purchaser should confirm which controls applied to the actual package and obtain current records before relying on them.<\/p>\n<h2>Quality Planning Across Facilities<\/h2>\n<p>A multi-plant quality plan should establish one hierarchy of technical requirements. If facilities interpret tolerances or inspection stages differently, inconsistencies may appear only during assembly or installation. Central clarification routes, agreed inspection templates, and periodic cross-plant reviews can reduce that risk. Where components interface, the plan may require dimensional correlation, match marking, controlled assembly, or trial fitting depending on design and contract requirements.<\/p>\n<p>Nonconformity control also needs a shared process. A deviation identified in one plant may affect a mating component produced elsewhere. Records should therefore identify affected parts, technical disposition authority, required reinspection, and any drawing or bill-of-material updates. Procurement teams should ask how information is propagated, not merely whether each facility has its own procedure.<\/p>\n<h2>A Source-Reported 28-Metre Transport Detail<\/h2>\n<p>The source caption reports that a 28-metre-long component was transported in one piece. That number is presented only as a source-reported project detail; it has not been independently verified here. It should not be treated as a standard product dimension, a routine logistics capability, or evidence that the same approach is suitable for another route.<\/p>\n<p>Long components require project-specific transport engineering. Reviews may cover route geometry, legal limits, vehicle configuration, supports, tie-down design, load distribution, turning envelopes, overhead clearance, escort or permit requirements, delivery windows, weather, unloading space, and lifting interfaces. The most economical fabrication split is not always the most economical delivered solution. Early dialogue between design, fabrication, logistics, and site teams can compare whole-component transport with engineered splices or other segmentation strategies.<\/p>\n<h2>Engineering and Procurement Value<\/h2>\n<p>For engineers, distributed fabrication can support schedule planning if interface geometry and change control are mature. It can also expose a project to rework if information is released unevenly. Package planning should identify interface-critical components, required survey data, connection assumptions, transport constraints, and the party authorized to resolve discrepancies.<\/p>\n<p>For buyers, capacity should be evaluated at the network level and at each proposed facility. A useful assessment examines equipment envelopes, personnel, welding processes, inspection resources, coating capability, material flow, current workload, subcontracted operations, and document systems. The manufacturing schedule should identify which plant produces each lot and how shared milestones are controlled.<\/p>\n<ul>\n<li>Request a plant allocation and responsibility matrix with the tender.<\/li>\n<li>Confirm that all facilities will use the contract\u2019s approved technical baseline.<\/li>\n<li>Place surveillance points according to risk and interface criticality.<\/li>\n<li>Review transport assumptions before freezing component lengths and splice locations.<\/li>\n<li>Require one consolidated manufacturing record index for the contracted package.<\/li>\n<\/ul>\n<h2>Scope Discipline in Project Reporting<\/h2>\n<p>The source supports reporting on multi-plant production coordination associated with the Jing\u2019ao project. It does not establish Zhonghengfeng\u2019s responsibility for the project\u2019s complete engineering, procurement, construction, installation, commissioning, or outcome. Current readers should verify the original contract package and any later changes if that distinction is material to qualification.<\/p>\n<p>To review a steel fabrication package involving multiple facilities, oversized components, inspection coordination, or delivery sequencing, please <a href=\"\/ar\/contact-us\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639\u0646\u0627<\/a>. Sharing drawings, specifications, component envelopes, destination constraints, and schedule priorities will support a more precise technical discussion.<\/p>","protected":false},"excerpt":{"rendered":"<p>The December 2021 source records multi-plant production coordination for the Jing\u2019ao project and a source-reported 28-metre component transport detail.<\/p>","protected":false},"author":1,"featured_media":1350,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1],"tags":[248,246,247,27,17],"class_list":["post-1371","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","tag-heavy-transport","tag-jingao-project","tag-production-coordination","tag-quality-control","tag-steel-fabrication"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Jing\u2019ao Project Fabrication Coordination | Zhonghengfeng<\/title>\n<meta name=\"description\" content=\"A source-based account of multi-plant steel fabrication coordination for the Jing\u2019ao project, with cautious treatment of dimensions and scope.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zhfsteelgroup.com\/ar\/jingao-project-multi-plant-fabrication-coordination\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jing\u2019ao Project Fabrication Coordination | Zhonghengfeng\" \/>\n<meta property=\"og:description\" content=\"A source-based account of multi-plant steel fabrication coordination for the Jing\u2019ao project, with cautious treatment of dimensions and scope.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zhfsteelgroup.com\/ar\/jingao-project-multi-plant-fabrication-coordination\/\" \/>\n<meta property=\"og:site_name\" content=\"Zhonghengfeng Steel Structure\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-04T06:16:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T08:34:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/jingao-steel-fabrication-welding.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"582\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Li Tao\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"Li Tao\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/\"},\"author\":{\"name\":\"Li Tao\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\"},\"headline\":\"Multi-Plant Fabrication Coordination for the Jing\u2019ao Project\",\"datePublished\":\"2021-12-04T06:16:00+00:00\",\"dateModified\":\"2026-10-22T08:34:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/\"},\"wordCount\":861,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/jingao-steel-fabrication-welding.webp\",\"keywords\":[\"Heavy Transport\",\"Jing\u2019ao Project\",\"Production Coordination\",\"quality-control\",\"steel-fabrication\"],\"articleSection\":[\"Company News\"],\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/\",\"name\":\"Jing\u2019ao Project Fabrication Coordination | Zhonghengfeng\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/jingao-steel-fabrication-welding.webp\",\"datePublished\":\"2021-12-04T06:16:00+00:00\",\"dateModified\":\"2026-10-22T08:34:19+00:00\",\"description\":\"A source-based account of multi-plant steel fabrication coordination for the Jing\u2019ao project, with cautious treatment of dimensions and scope.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/#primaryimage\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/jingao-steel-fabrication-welding.webp\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/jingao-steel-fabrication-welding.webp\",\"width\":1080,\"height\":582,\"caption\":\"Source photograph of multiple welding stations operating in a steel fabrication workshop during work associated by the source with the Jing'ao project.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jingao-project-multi-plant-fabrication-coordination\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Multi-Plant Fabrication Coordination for the Jing\u2019ao Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"name\":\"Zhonghengfeng Steel Structure\",\"description\":\"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.\",\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zhfsteelgroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\",\"name\":\"Zhong Heng Feng Building Group Co., Ltd.\",\"alternateName\":\"ZHF Group\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"width\":822,\"height\":709,\"caption\":\"Zhong Heng Feng Building Group Co., Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/zhonghengfeng-construction-group-co-ltd\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\",\"name\":\"Li Tao\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"caption\":\"Li Tao\"},\"description\":\"Steel Structure Expert, China.\",\"sameAs\":[\"http:\\\/\\\/zhfsteelgroup.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Jing\u2019ao Project Fabrication Coordination | Zhonghengfeng","description":"A source-based account of multi-plant steel fabrication coordination for the Jing\u2019ao project, with cautious treatment of dimensions and scope.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zhfsteelgroup.com\/ar\/jingao-project-multi-plant-fabrication-coordination\/","og_locale":"ar_AR","og_type":"article","og_title":"Jing\u2019ao Project Fabrication Coordination | Zhonghengfeng","og_description":"A source-based account of multi-plant steel fabrication coordination for the Jing\u2019ao project, with cautious treatment of dimensions and scope.","og_url":"https:\/\/zhfsteelgroup.com\/ar\/jingao-project-multi-plant-fabrication-coordination\/","og_site_name":"Zhonghengfeng Steel Structure","article_published_time":"2021-12-04T06:16:00+00:00","article_modified_time":"2026-10-22T08:34:19+00:00","og_image":[{"width":1080,"height":582,"url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/jingao-steel-fabrication-welding.webp","type":"image\/webp"}],"author":"Li Tao","twitter_card":"summary_large_image","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"Li Tao","\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"4 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/#article","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/"},"author":{"name":"Li Tao","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825"},"headline":"Multi-Plant Fabrication Coordination for the Jing\u2019ao Project","datePublished":"2021-12-04T06:16:00+00:00","dateModified":"2026-10-22T08:34:19+00:00","mainEntityOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/"},"wordCount":861,"commentCount":0,"publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/jingao-steel-fabrication-welding.webp","keywords":["Heavy Transport","Jing\u2019ao Project","Production Coordination","quality-control","steel-fabrication"],"articleSection":["Company News"],"inLanguage":"ar","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/","url":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/","name":"Jing\u2019ao Project Fabrication Coordination | Zhonghengfeng","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/#primaryimage"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/jingao-steel-fabrication-welding.webp","datePublished":"2021-12-04T06:16:00+00:00","dateModified":"2026-10-22T08:34:19+00:00","description":"A source-based account of multi-plant steel fabrication coordination for the Jing\u2019ao project, with cautious treatment of dimensions and scope.","breadcrumb":{"@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/#primaryimage","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/jingao-steel-fabrication-welding.webp","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/jingao-steel-fabrication-welding.webp","width":1080,"height":582,"caption":"Source photograph of multiple welding stations operating in a steel fabrication workshop during work associated by the source with the Jing'ao project."},{"@type":"BreadcrumbList","@id":"https:\/\/zhfsteelgroup.com\/jingao-project-multi-plant-fabrication-coordination\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/zhfsteelgroup.com\/"},{"@type":"ListItem","position":2,"name":"Multi-Plant Fabrication Coordination for the Jing\u2019ao Project"}]},{"@type":"WebSite","@id":"https:\/\/zhfsteelgroup.com\/#website","url":"https:\/\/zhfsteelgroup.com\/","name":"Zhonghengfeng Steel Structure","description":"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.","publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zhfsteelgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/zhfsteelgroup.com\/#organization","name":"Zhong Heng Feng Building Group Co., Ltd.","alternateName":"ZHF Group","url":"https:\/\/zhfsteelgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","width":822,"height":709,"caption":"Zhong Heng Feng Building Group Co., Ltd."},"image":{"@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/zhonghengfeng-construction-group-co-ltd\/"]},{"@type":"Person","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825","name":"\u0644\u064a \u062a\u0627\u0648","image":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","caption":"Li Tao"},"description":"Steel Structure Expert, China.","sameAs":["http:\/\/zhfsteelgroup.com"]}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/jingao-steel-fabrication-welding.webp","_links":{"self":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/comments?post=1371"}],"version-history":[{"count":1,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1371\/revisions"}],"predecessor-version":[{"id":1391,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1371\/revisions\/1391"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media\/1350"}],"wp:attachment":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media?parent=1371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/categories?post=1371"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/tags?post=1371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}