{"id":1327,"date":"2021-02-24T07:09:00","date_gmt":"2021-02-24T15:09:00","guid":{"rendered":"https:\/\/zhfsteelgroup.com\/?p=1327"},"modified":"2026-10-21T23:41:37","modified_gmt":"2026-10-22T07:41:37","slug":"jinsheng-road-dahei-river-cable-stayed-bridge","status":"publish","type":"post","link":"https:\/\/zhfsteelgroup.com\/ar\/jinsheng-road-dahei-river-cable-stayed-bridge\/","title":{"rendered":"Project-Focused Review of the Jinsheng Road Dahei River Cable-Stayed Bridge in Hohhot"},"content":{"rendered":"<p><!-- Source URL: https:\/\/mp.weixin.qq.com\/s\/yIKE2qyZ8eQUeRKf1n_ngg\nChinese listing ID: 93\nSource title: \u4e0e\u68a6\u60f3\u540c\u884c\nOriginal publication date: 2021-02-24T23:09:00+08:00 --><\/p>\n<p>The original source identifies the Jinsheng Road Dahei River cable-stayed bridge project in Hohhot and presents it alongside broad reflections on teamwork, training and service. For an engineering audience, the project reference is more useful than the promotional language. This article therefore isolates the Dahei River bridge storyline and translates it into a cautious discussion of the controls relevant to a cable-stayed bridge package.<\/p>\n<p>The source is sparse. It names the project and associates the article with Li Wei of Zhonghengfeng Group\u2019s bridge company, but it does not state the company\u2019s precise contract scope, quantities, design parameters, delivery dates or completed milestones. It also names a separate Yunzhong Road airport connection project. That separate project has been excluded so that locations and scopes are not blended.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/cable-stayed-bridge-project-review.webp\" alt=\"Illustrative modern cable-stayed bridge crossing a river in an urban outskirts setting.\"><figcaption>Illustrative cable-stayed bridge scene supporting the source-described Dahei River project review; it is not a project photograph.<\/figcaption><\/figure>\n<h2>What the Source Establishes<\/h2>\n<div style=\"max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;\">\n<table style=\"width:100%;table-layout:fixed;overflow-wrap:anywhere;word-break:break-word;\">\n<thead>\n<tr>\n<th>Field<\/th>\n<th>Confirmed by the source<\/th>\n<th>Not established by the source<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Project<\/td>\n<td>Jinsheng Road Dahei River cable-stayed bridge project<\/td>\n<td>Full formal contract title<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0645\u0648\u0642\u0639<\/td>\n<td>Hohhot<\/td>\n<td>Detailed chainage or site limits<\/td>\n<\/tr>\n<tr>\n<td>Company connection<\/td>\n<td>Article authored by Li Wei of the bridge company and illustrated with the project<\/td>\n<td>Exact contractual role or share of the overall project<\/td>\n<\/tr>\n<tr>\n<td>Technical information<\/td>\n<td>Bridge type identified as cable-stayed<\/td>\n<td>Span, tower, stay, steel tonnage or erection method<\/td>\n<\/tr>\n<tr>\n<td>Status<\/td>\n<td>Project presented in the February 2021 source<\/td>\n<td>Verified completion or acceptance milestone<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>These boundaries matter. A company news article should not turn a photograph and project name into a claim of design, fabrication or construction responsibility. Any published scope statement should be checked against the applicable contract, work order or approved project record.<\/p>\n<h2>Why Scope Definition Comes First<\/h2>\n<p>Cable-stayed bridges involve connected systems and multiple specialist interfaces. Depending on the package, parties may be responsible for design support, shop detailing, steel fabrication, stay components, transport, erection, welding, coating, surveying, testing or only selected portions. Procurement decisions change significantly with that boundary.<\/p>\n<p>A scope matrix should identify each deliverable, the responsible party, required input, review authority and handover point. It should also distinguish permanent works from temporary works. Without that matrix, two organizations may each assume the other is supplying an embedded item, a connection detail, lifting accessory or inspection record.<\/p>\n<ul>\n<li>Define the physical limits of every package.<\/li>\n<li>Identify who supplies drawings, calculations and approved revisions.<\/li>\n<li>Assign responsibility for temporary works and construction-stage checks.<\/li>\n<li>List inspection, testing and record deliverables at each handover.<\/li>\n<li>Control exclusions and changes through written instructions.<\/li>\n<\/ul>\n<h2>Engineering Interfaces on a Cable-Stayed Bridge<\/h2>\n<p>The bridge type named in the source makes interface control especially relevant, but no project-specific method should be invented. In general, geometry, stiffness, erection sequence and load transfer are interdependent on cable-stayed structures. A change in one area may affect another, so technical queries need clear routing and timely closure.<\/p>\n<p>For steel elements, the approved model or drawings must align with shop information and component identification. For stays and anchorage zones, interface dimensions and installation requirements must be unambiguous. For field work, surveying and construction-stage criteria should come from approved project documents. These are general engineering principles, not claims that Zhonghengfeng held responsibility for each activity on this project.<\/p>\n<h2>Procurement and Traceability Controls<\/h2>\n<p>Procurement should follow the approved scope and sequence. Long-lead items, specialist components and materials requiring defined inspection or certification need early identification. A procurement register can connect each item to its specification, approval status, required-on-site date, supplier, inspection stage and document status.<\/p>\n<p>Traceability is equally important. Material and component identification should continue through receiving, processing, inspection, storage and dispatch where those stages are within a supplier\u2019s package. Released and unreleased items should remain distinguishable, while records should use the same identifiers that appear on the applicable drawings and delivery documentation.<\/p>\n<table>\n<thead>\n<tr>\n<th>Procurement control<\/th>\n<th>Question to close<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Technical definition<\/td>\n<td>Is the latest approved requirement attached to the purchase package?<\/td>\n<\/tr>\n<tr>\n<td>Supplier capability<\/td>\n<td>Can the supplier meet the specified process, inspection and documentation needs?<\/td>\n<\/tr>\n<tr>\n<td>Sequence<\/td>\n<td>Does the required date reflect the executable construction sequence?<\/td>\n<\/tr>\n<tr>\n<td>Inspection<\/td>\n<td>Which points require review, witness, hold or release?<\/td>\n<\/tr>\n<tr>\n<td>Documentation<\/td>\n<td>What certificates, reports and identification must accompany delivery?<\/td>\n<\/tr>\n<tr>\n<td>Change control<\/td>\n<td>How will revisions reach suppliers and affected project teams?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Site Handover and Communication<\/h2>\n<p>The source speaks generally about teamwork and customer service but provides no measurable project outcomes. A more concrete interpretation is disciplined handover. Before a component or system moves to the next party, the team should confirm physical status, documentation status, open issues and the limits of acceptance. A handover with unresolved matters is not necessarily invalid, but the exceptions must be visible and assigned.<\/p>\n<p>Regular interface meetings are useful only when they produce controlled actions. Each action should state what is required, who owns it and when it is due. Technical decisions should be incorporated into the affected drawings, schedules or procurement instructions rather than remaining only in meeting notes.<\/p>\n<h2>Evidence-Based Company News<\/h2>\n<p>The February 2021 source contains predictions about corporate growth and extensive culture language. Those passages have been removed because they do not verify bridge performance. This revised account makes no prediction and does not claim that the project was completed, accepted or delivered to a particular technical metric.<\/p>\n<p>Instead, the article retains the single project fact that can be used responsibly\u2014the Jinsheng Road Dahei River cable-stayed bridge in Hohhot\u2014and explains why scope definition, interface control, procurement traceability and documented handover matter. Before publication with any additional achievements, the project team should supply contract-backed scope and milestone evidence.<\/p>\n<h2>Discuss a Defined Bridge Package<\/h2>\n<p>Owners, contractors and engineering teams evaluating a bridge package need clear scope boundaries before capability, schedule or commercial comparisons can be meaningful. Share the relevant project type, supply boundary, technical documents, required dates and inspection expectations through our <a href=\"\/ar\/contact-us\/\">contact page<\/a>. A structured review can then focus on the deliverables supported by actual project information.<\/p>","protected":false},"excerpt":{"rendered":"<p>The source identifies the Jinsheng Road Dahei River cable-stayed bridge in Hohhot; this review focuses on the practical controls such a package requires.<\/p>","protected":false},"author":1,"featured_media":1317,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1],"tags":[22,242,241,239,240],"class_list":["post-1327","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","tag-bridge-engineering","tag-cable-stayed-bridge","tag-dahei-river","tag-hohhot","tag-jinsheng-road"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Jinsheng Road Dahei River Cable-Stayed Bridge Review<\/title>\n<meta name=\"description\" content=\"A carefully bounded review of the source-described Jinsheng Road Dahei River cable-stayed bridge project in Hohhot and its delivery controls.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zhfsteelgroup.com\/ar\/jinsheng-road-dahei-river-cable-stayed-bridge\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jinsheng Road Dahei River Cable-Stayed Bridge Review\" \/>\n<meta property=\"og:description\" content=\"A carefully bounded review of the source-described Jinsheng Road Dahei River cable-stayed bridge project in Hohhot and its delivery controls.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zhfsteelgroup.com\/ar\/jinsheng-road-dahei-river-cable-stayed-bridge\/\" \/>\n<meta property=\"og:site_name\" content=\"Zhonghengfeng Steel Structure\" \/>\n<meta property=\"article:published_time\" content=\"2021-02-24T15:09:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T07:41:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/cable-stayed-bridge-project-review.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Li Tao\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"Li Tao\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/\"},\"author\":{\"name\":\"Li Tao\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\"},\"headline\":\"Project-Focused Review of the Jinsheng Road Dahei River Cable-Stayed Bridge in Hohhot\",\"datePublished\":\"2021-02-24T15:09:00+00:00\",\"dateModified\":\"2026-10-22T07:41:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/\"},\"wordCount\":972,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cable-stayed-bridge-project-review.webp\",\"keywords\":[\"bridge-engineering\",\"cable-stayed bridge\",\"Dahei River\",\"Hohhot\",\"Jinsheng Road\"],\"articleSection\":[\"Company News\"],\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/\",\"name\":\"Jinsheng Road Dahei River Cable-Stayed Bridge Review\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cable-stayed-bridge-project-review.webp\",\"datePublished\":\"2021-02-24T15:09:00+00:00\",\"dateModified\":\"2026-10-22T07:41:37+00:00\",\"description\":\"A carefully bounded review of the source-described Jinsheng Road Dahei River cable-stayed bridge project in Hohhot and its delivery controls.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/#primaryimage\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cable-stayed-bridge-project-review.webp\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cable-stayed-bridge-project-review.webp\",\"width\":1500,\"height\":1000,\"caption\":\"Illustrative cable-stayed bridge scene supporting the source-described Dahei River project review; it is not a project photograph.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/jinsheng-road-dahei-river-cable-stayed-bridge\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project-Focused Review of the Jinsheng Road Dahei River Cable-Stayed Bridge in Hohhot\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"name\":\"Zhonghengfeng Steel Structure\",\"description\":\"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.\",\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zhfsteelgroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\",\"name\":\"Zhong Heng Feng Building Group Co., Ltd.\",\"alternateName\":\"ZHF Group\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"width\":822,\"height\":709,\"caption\":\"Zhong Heng Feng Building Group Co., Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/zhonghengfeng-construction-group-co-ltd\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\",\"name\":\"Li Tao\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"caption\":\"Li Tao\"},\"description\":\"Steel Structure Expert, China.\",\"sameAs\":[\"http:\\\/\\\/zhfsteelgroup.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Jinsheng Road Dahei River Cable-Stayed Bridge Review","description":"A carefully bounded review of the source-described Jinsheng Road Dahei River cable-stayed bridge project in Hohhot and its delivery controls.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zhfsteelgroup.com\/ar\/jinsheng-road-dahei-river-cable-stayed-bridge\/","og_locale":"ar_AR","og_type":"article","og_title":"Jinsheng Road Dahei River Cable-Stayed Bridge Review","og_description":"A carefully bounded review of the source-described Jinsheng Road Dahei River cable-stayed bridge project in Hohhot and its delivery controls.","og_url":"https:\/\/zhfsteelgroup.com\/ar\/jinsheng-road-dahei-river-cable-stayed-bridge\/","og_site_name":"Zhonghengfeng Steel Structure","article_published_time":"2021-02-24T15:09:00+00:00","article_modified_time":"2026-10-22T07:41:37+00:00","og_image":[{"width":1500,"height":1000,"url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/cable-stayed-bridge-project-review.webp","type":"image\/webp"}],"author":"Li Tao","twitter_card":"summary_large_image","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"Li Tao","\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"5 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/#article","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/"},"author":{"name":"Li Tao","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825"},"headline":"Project-Focused Review of the Jinsheng Road Dahei River Cable-Stayed Bridge in Hohhot","datePublished":"2021-02-24T15:09:00+00:00","dateModified":"2026-10-22T07:41:37+00:00","mainEntityOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/"},"wordCount":972,"commentCount":0,"publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/cable-stayed-bridge-project-review.webp","keywords":["bridge-engineering","cable-stayed bridge","Dahei River","Hohhot","Jinsheng Road"],"articleSection":["Company News"],"inLanguage":"ar","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/","url":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/","name":"Jinsheng Road Dahei River Cable-Stayed Bridge Review","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/#primaryimage"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/cable-stayed-bridge-project-review.webp","datePublished":"2021-02-24T15:09:00+00:00","dateModified":"2026-10-22T07:41:37+00:00","description":"A carefully bounded review of the source-described Jinsheng Road Dahei River cable-stayed bridge project in Hohhot and its delivery controls.","breadcrumb":{"@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/#primaryimage","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/cable-stayed-bridge-project-review.webp","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/cable-stayed-bridge-project-review.webp","width":1500,"height":1000,"caption":"Illustrative cable-stayed bridge scene supporting the source-described Dahei River project review; it is not a project photograph."},{"@type":"BreadcrumbList","@id":"https:\/\/zhfsteelgroup.com\/jinsheng-road-dahei-river-cable-stayed-bridge\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/zhfsteelgroup.com\/"},{"@type":"ListItem","position":2,"name":"Project-Focused Review of the Jinsheng Road Dahei River Cable-Stayed Bridge in Hohhot"}]},{"@type":"WebSite","@id":"https:\/\/zhfsteelgroup.com\/#website","url":"https:\/\/zhfsteelgroup.com\/","name":"Zhonghengfeng Steel Structure","description":"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.","publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zhfsteelgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/zhfsteelgroup.com\/#organization","name":"Zhong Heng Feng Building Group Co., Ltd.","alternateName":"ZHF Group","url":"https:\/\/zhfsteelgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","width":822,"height":709,"caption":"Zhong Heng Feng Building Group Co., Ltd."},"image":{"@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/zhonghengfeng-construction-group-co-ltd\/"]},{"@type":"Person","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825","name":"\u0644\u064a \u062a\u0627\u0648","image":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","caption":"Li Tao"},"description":"Steel Structure Expert, China.","sameAs":["http:\/\/zhfsteelgroup.com"]}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/cable-stayed-bridge-project-review.webp","_links":{"self":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1327","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/comments?post=1327"}],"version-history":[{"count":2,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1327\/revisions"}],"predecessor-version":[{"id":1347,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1327\/revisions\/1347"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media\/1317"}],"wp:attachment":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media?parent=1327"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/categories?post=1327"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/tags?post=1327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}