{"id":1326,"date":"2021-02-08T07:02:00","date_gmt":"2021-02-08T15:02:00","guid":{"rendered":"https:\/\/zhfsteelgroup.com\/?p=1326"},"modified":"2026-10-21T23:41:32","modified_gmt":"2026-10-22T07:41:32","slug":"taiyuan-riverside-cycling-route-hedong-viaduct","status":"publish","type":"post","link":"https:\/\/zhfsteelgroup.com\/ar\/taiyuan-riverside-cycling-route-hedong-viaduct\/","title":{"rendered":"Delivery Coordination for Taiyuan\u2019s Riverside Cycling Route Hedong Viaduct Section"},"content":{"rendered":"<p><!-- Source URL: https:\/\/mp.weixin.qq.com\/s\/wgIquLGMPjL5ZnjiV2Extw\nChinese listing ID: 90\nSource title: \u201c\u4e00\u5207\u4ee5\u670d\u52a1\u5ba2\u6237\u4e3a\u4e2d\u5fc3\u201d\uff0c\u8fd9\u662f\u6211\u542c\u8fc7\u6700\u786c\u6838\u7684\u56de\u7b54\nOriginal publication date: 2021-02-08T23:02:00+08:00 --><\/p>\n<p>The Taiyuan Riverside Cycling Route project included a Hedong elevated bridge section that required close coordination between bridge activities and the surrounding civil works. The source article states that Zhonghengfeng Group undertook the Hedong viaduct portion, with a stated length of 1,164 meters. It also records that the first batch of material reached the site on October 18, 2020.<\/p>\n<p>This account is deliberately limited to that Taiyuan project line. The source article also discussed a separate Yulin chemical project, but the two packages have different locations, counterparties and scopes. Combining them would obscure the facts relevant to the Hedong viaduct. The original article\u2019s holiday narrative and its unsupported superlative about the other project have likewise been excluded.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/taiyuan-riverside-cycling-route-viaduct.webp\" alt=\"Aerial view of the Hedong elevated bridge section within Taiyuan\u2019s riverside cycling-route project.\"><figcaption>Aerial project view associated with the source-described Hedong elevated bridge section in Taiyuan.<\/figcaption><\/figure>\n<h2>Source-Defined Scope and Project Facts<\/h2>\n<p>The source describes the Taiyuan work as part of the city\u2019s riverside dedicated cycling-route project and identifies Zhonghengfeng\u2019s package as the Hedong elevated bridge portion. It calls the work a bridge project and says progress was strongly affected by civil-construction factors. The article does not provide a full contract schedule, detailed quantities, design parameters or an itemized split among fabrication, supply and installation. Those elements should not be inferred.<\/p>\n<div style=\"max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;\">\n<table style=\"width:100%;table-layout:fixed;overflow-wrap:anywhere;word-break:break-word;\">\n<thead>\n<tr>\n<th>Item<\/th>\n<th>Source-confirmed information<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Project<\/td>\n<td>Taiyuan Riverside Dedicated Cycling Route project<\/td>\n<\/tr>\n<tr>\n<td>Package<\/td>\n<td>Hedong elevated bridge portion undertaken by the group<\/td>\n<\/tr>\n<tr>\n<td>Stated length<\/td>\n<td>1,164 meters<\/td>\n<\/tr>\n<tr>\n<td>First material arrival<\/td>\n<td>October 18, 2020<\/td>\n<\/tr>\n<tr>\n<td>Key interface<\/td>\n<td>Bridge activities were affected by civil-construction conditions<\/td>\n<\/tr>\n<tr>\n<td>Source contact<\/td>\n<td>Project lead Li Pengfeng was interviewed about the Taiyuan package<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The original source gave an expected completion point in late April 2021. Because that was a forward-looking schedule reported in February 2021, it is not presented here as an achieved completion date. Confirmed as-built status would require later project records.<\/p>\n<h2>Managing the Civil-Bridge Interface<\/h2>\n<p>A bridge package can only proceed when its work fronts, access, foundations or supporting civil conditions are ready for the next operation. The source explicitly notes the Taiyuan package\u2019s dependence on civil works. That makes interface management a central delivery task. It requires both parties to exchange current information about readiness, constraints and revised priorities.<\/p>\n<p>A useful interface register identifies each required condition, the responsible organization, the date needed and the evidence of readiness. If a civil condition is incomplete, the bridge team can use the record to assess whether production, transport or field sequencing should change. This reduces the risk of dispatching a component before the site can receive or use it.<\/p>\n<ul>\n<li>Confirm the next available work front before finalizing dispatch.<\/li>\n<li>Record access, lifting-area and temporary-work constraints.<\/li>\n<li>Link each constraint to an owner and target resolution date.<\/li>\n<li>Issue revised priorities to engineering, production, procurement and logistics.<\/li>\n<li>Retain the decision trail when sequence changes affect planned work.<\/li>\n<\/ul>\n<h2>Material Arrival and Traceable Handover<\/h2>\n<p>The first material arrival on October 18, 2020 is the clearest logistics milestone in the source. For procurement and project-control teams, arrival is not the end of the supply process. The receiving team must identify the shipment, compare it with the dispatch documents, note condition and quantity, and route any discrepancy for resolution.<\/p>\n<p>On a linear or elevated bridge work front, laydown space may be limited. Delivery sequence therefore matters. Material that arrives too early may require additional handling, while late arrival can leave an available work front unused. A rolling delivery plan should reflect current site readiness, transport constraints and the release status of each component. The source does not give shipment counts or tonnage, so no quantitative performance claim is made.<\/p>\n<h2>Field Coordination and Safety Close-Out<\/h2>\n<p>The article describes the project team working to maintain progress and mentions checking the site for safety hazards before a planned shutdown. The relevant operational lesson is that temporary suspension requires a controlled close-out. Materials need to be secured, access conditions reviewed, temporary services checked and open issues assigned for follow-up.<\/p>\n<p>This should not be framed as personal sacrifice or as proof of an accident-free project. A sound close-out is a normal part of project control. The same discipline is required when restarting: verify changed site conditions, brief personnel, confirm equipment status and ensure that the current work method and sequence are understood.<\/p>\n<h2>Information Needed by Engineering and Procurement<\/h2>\n<p>The Taiyuan example demonstrates why engineering, procurement and field teams need a shared view of sequence. Engineering must know which area will be available next and whether a technical question blocks release. Procurement needs to know which material protects that sequence. Logistics needs the receiving window and access plan. Site management needs clear identification and records for what is arriving.<\/p>\n<p>A concise weekly control set can include:<\/p>\n<ol>\n<li>a two- to six-week work-front outlook;<\/li>\n<li>a component or material status list tied to that outlook;<\/li>\n<li>open technical queries and approval dates;<\/li>\n<li>civil-interface constraints and responsible parties;<\/li>\n<li>planned dispatches, receiving windows and required documents; and<\/li>\n<li>safety actions needed before starting, pausing or changing the operation.<\/li>\n<\/ol>\n<h2>Delivery Value Without Overstatement<\/h2>\n<p>The source supports a specific and useful story: Zhonghengfeng\u2019s team worked on the 1,164-meter Hedong viaduct portion of Taiyuan\u2019s riverside cycling-route project, received its first batch of material in October 2020 and managed a package affected by civil-work interfaces. It does not support attributing the overall municipal project to one participant or claiming final completion from a forecast.<\/p>\n<p>For owners and contractors, the procurement value lies in matching supply with an executable field sequence. For engineering teams, it lies in identifying interface decisions early enough to protect fabrication and dispatch. To discuss a defined steel bridge package, delivery sequence or project interface, please use our <a href=\"\/ar\/contact-us\/\">contact page<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>The 1,164-meter Hedong viaduct section shows why material arrival, civil-work interfaces, field sequencing and safety close-out must remain coordinated.<\/p>","protected":false},"author":1,"featured_media":1316,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1],"tags":[237,236,235,238,234],"class_list":["post-1326","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","tag-bridge-project","tag-cycling-route","tag-hedong-viaduct","tag-steel-bridge-delivery","tag-taiyuan"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Taiyuan Hedong Viaduct Section Delivery Coordination<\/title>\n<meta name=\"description\" content=\"A factual account of the 1,164-meter Hedong viaduct section within Taiyuan\u2019s riverside cycling-route project and its delivery interfaces.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zhfsteelgroup.com\/ar\/taiyuan-riverside-cycling-route-hedong-viaduct\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Taiyuan Hedong Viaduct Section Delivery Coordination\" \/>\n<meta property=\"og:description\" content=\"A factual account of the 1,164-meter Hedong viaduct section within Taiyuan\u2019s riverside cycling-route project and its delivery interfaces.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zhfsteelgroup.com\/ar\/taiyuan-riverside-cycling-route-hedong-viaduct\/\" \/>\n<meta property=\"og:site_name\" content=\"Zhonghengfeng Steel Structure\" \/>\n<meta property=\"article:published_time\" content=\"2021-02-08T15:02:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T07:41:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/taiyuan-riverside-cycling-route-viaduct.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"852\" \/>\n\t<meta property=\"og:image:height\" content=\"472\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Li Tao\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"Li Tao\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/\"},\"author\":{\"name\":\"Li Tao\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\"},\"headline\":\"Delivery Coordination for Taiyuan\u2019s Riverside Cycling Route Hedong Viaduct Section\",\"datePublished\":\"2021-02-08T15:02:00+00:00\",\"dateModified\":\"2026-10-22T07:41:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/\"},\"wordCount\":926,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/taiyuan-riverside-cycling-route-viaduct.webp\",\"keywords\":[\"bridge project\",\"cycling route\",\"Hedong viaduct\",\"steel bridge delivery\",\"Taiyuan\"],\"articleSection\":[\"Company News\"],\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/\",\"name\":\"Taiyuan Hedong Viaduct Section Delivery Coordination\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/taiyuan-riverside-cycling-route-viaduct.webp\",\"datePublished\":\"2021-02-08T15:02:00+00:00\",\"dateModified\":\"2026-10-22T07:41:32+00:00\",\"description\":\"A factual account of the 1,164-meter Hedong viaduct section within Taiyuan\u2019s riverside cycling-route project and its delivery interfaces.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/#primaryimage\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/taiyuan-riverside-cycling-route-viaduct.webp\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/taiyuan-riverside-cycling-route-viaduct.webp\",\"width\":852,\"height\":472,\"caption\":\"Aerial project view associated with the source-described Hedong elevated bridge section in Taiyuan.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/taiyuan-riverside-cycling-route-hedong-viaduct\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Delivery Coordination for Taiyuan\u2019s Riverside Cycling Route Hedong Viaduct Section\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"name\":\"Zhonghengfeng Steel Structure\",\"description\":\"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.\",\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zhfsteelgroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\",\"name\":\"Zhong Heng Feng Building Group Co., Ltd.\",\"alternateName\":\"ZHF Group\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"width\":822,\"height\":709,\"caption\":\"Zhong Heng Feng Building Group Co., Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/zhonghengfeng-construction-group-co-ltd\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\",\"name\":\"Li Tao\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"caption\":\"Li Tao\"},\"description\":\"Steel Structure Expert, China.\",\"sameAs\":[\"http:\\\/\\\/zhfsteelgroup.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Taiyuan Hedong Viaduct Section Delivery Coordination","description":"A factual account of the 1,164-meter Hedong viaduct section within Taiyuan\u2019s riverside cycling-route project and its delivery interfaces.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zhfsteelgroup.com\/ar\/taiyuan-riverside-cycling-route-hedong-viaduct\/","og_locale":"ar_AR","og_type":"article","og_title":"Taiyuan Hedong Viaduct Section Delivery Coordination","og_description":"A factual account of the 1,164-meter Hedong viaduct section within Taiyuan\u2019s riverside cycling-route project and its delivery interfaces.","og_url":"https:\/\/zhfsteelgroup.com\/ar\/taiyuan-riverside-cycling-route-hedong-viaduct\/","og_site_name":"Zhonghengfeng Steel Structure","article_published_time":"2021-02-08T15:02:00+00:00","article_modified_time":"2026-10-22T07:41:32+00:00","og_image":[{"width":852,"height":472,"url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/taiyuan-riverside-cycling-route-viaduct.webp","type":"image\/webp"}],"author":"Li Tao","twitter_card":"summary_large_image","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"Li Tao","\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"5 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/#article","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/"},"author":{"name":"Li Tao","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825"},"headline":"Delivery Coordination for Taiyuan\u2019s Riverside Cycling Route Hedong Viaduct Section","datePublished":"2021-02-08T15:02:00+00:00","dateModified":"2026-10-22T07:41:32+00:00","mainEntityOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/"},"wordCount":926,"commentCount":0,"publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/taiyuan-riverside-cycling-route-viaduct.webp","keywords":["bridge project","cycling route","Hedong viaduct","steel bridge delivery","Taiyuan"],"articleSection":["Company News"],"inLanguage":"ar","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/","url":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/","name":"Taiyuan Hedong Viaduct Section Delivery Coordination","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/#primaryimage"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/taiyuan-riverside-cycling-route-viaduct.webp","datePublished":"2021-02-08T15:02:00+00:00","dateModified":"2026-10-22T07:41:32+00:00","description":"A factual account of the 1,164-meter Hedong viaduct section within Taiyuan\u2019s riverside cycling-route project and its delivery interfaces.","breadcrumb":{"@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/#primaryimage","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/taiyuan-riverside-cycling-route-viaduct.webp","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/taiyuan-riverside-cycling-route-viaduct.webp","width":852,"height":472,"caption":"Aerial project view associated with the source-described Hedong elevated bridge section in Taiyuan."},{"@type":"BreadcrumbList","@id":"https:\/\/zhfsteelgroup.com\/taiyuan-riverside-cycling-route-hedong-viaduct\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/zhfsteelgroup.com\/"},{"@type":"ListItem","position":2,"name":"Delivery Coordination for Taiyuan\u2019s Riverside Cycling Route Hedong Viaduct Section"}]},{"@type":"WebSite","@id":"https:\/\/zhfsteelgroup.com\/#website","url":"https:\/\/zhfsteelgroup.com\/","name":"Zhonghengfeng Steel Structure","description":"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.","publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zhfsteelgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/zhfsteelgroup.com\/#organization","name":"Zhong Heng Feng Building Group Co., Ltd.","alternateName":"ZHF Group","url":"https:\/\/zhfsteelgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","width":822,"height":709,"caption":"Zhong Heng Feng Building Group Co., Ltd."},"image":{"@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/zhonghengfeng-construction-group-co-ltd\/"]},{"@type":"Person","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825","name":"\u0644\u064a \u062a\u0627\u0648","image":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","caption":"Li Tao"},"description":"Steel Structure Expert, China.","sameAs":["http:\/\/zhfsteelgroup.com"]}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/taiyuan-riverside-cycling-route-viaduct.webp","_links":{"self":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1326","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/comments?post=1326"}],"version-history":[{"count":2,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1326\/revisions"}],"predecessor-version":[{"id":1346,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1326\/revisions\/1346"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media\/1316"}],"wp:attachment":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media?parent=1326"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/categories?post=1326"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/tags?post=1326"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}