{"id":1253,"date":"2023-10-04T07:12:00","date_gmt":"2023-10-04T15:12:00","guid":{"rendered":"https:\/\/zhfsteelgroup.com\/?p=1253"},"modified":"2026-10-21T21:40:04","modified_gmt":"2026-10-22T05:40:04","slug":"guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection","status":"publish","type":"post","link":"https:\/\/zhfsteelgroup.com\/ar\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/","title":{"rendered":"Main-Line Steel Box Girder Erection Began on Guangzhou Baiyun Municipal Lot 6"},"content":{"rendered":"<p><!-- Source URL: https:\/\/mp.weixin.qq.com\/s\/NapzSaWJYy2vmdNwBjNhZA | Chinese listing ID: 193 | Source title: \u9a6c\u4e0d\u505c\u8e44\uff0c6\u6807\u540a\u88c5\u6b63\u5f0f\u542f\u52a8\uff0c\u5e7f\u5dde\u767d\u4e91\u5e02\u653f\u9879\u76ee\u63d0\u6863\u52a0\u901f\u4e2d | Original publication date: 2023-10-04 23:12 +08:00 --><\/p>\n<p>On October 4, 2023, steel box girder erection entered a new stage on Guangzhou Baiyun Municipal Lot 6. Using a 400-ton crawler crane, the project team lifted the first main-line steel cross girder and set it into the reserved bearing position. The operation took nearly two hours. Its completion marked the formal start of main-line steel box girder erection for this section of the municipal works.<\/p>\n<p>The milestone was part of the wider construction effort around Guangzhou Baiyun Station and its integrated transport connections. At the time of publication, the work was being coordinated with the then-current objective of enabling the station to meet opening-readiness conditions by the end of 2023. The project also planned to complete the relevant erection works by late October 2023. These were schedules stated at that time, rather than confirmation of subsequent completion.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/guangzhou-baiyun-lot-6-steel-girder-lift.webp\" alt=\"Crawler crane lifting a steel cross girder into position on Guangzhou Baiyun Municipal Lot 6.\"><figcaption>A crawler crane lifts the first main-line steel cross girder on Guangzhou Baiyun Municipal Lot 6 in October 2023.<\/figcaption><\/figure>\n<h2>A controlled start to the main-line erection sequence<\/h2>\n<p>The first lift mattered for more than the placement of one component. On a steel bridge or elevated municipal structure, the opening erection activity helps establish the practical sequence for crane positioning, lifting, temporary support, alignment and handover between work teams. Lessons from the first operation can then be applied to later sections, including the left carriageway and the A and B ramps referenced in the original project report.<\/p>\n<p>Before the lift, the project manager organized several technical review meetings with specialists. The team studied the construction safety plan, rehearsed the lifting process and reviewed the operating parameters. This preparation was intended to reduce uncertainty before a large component moved above the work area and to give the lifting crew, survey personnel, supervisors and equipment operators a shared execution plan.<\/p>\n<h2>Digital planning and site controls<\/h2>\n<p>Building information modeling was used to create a dimensional model of the component and to simulate installation steps and parameter settings. The purpose was to support installation planning and help the team work toward the specified fit-up and alignment requirements. The source describes these measures as part of the project\u2019s control process; it does not provide independent inspection data or final acceptance results.<\/p>\n<p>Weather monitoring was another practical part of the lifting plan. The team tracked wind conditions and adjusted work activities when necessary. For high-level lifting, this is an essential management discipline: even when crane capacity is adequate, wind can influence component behavior, tag-line control and the safe working envelope. Linking weather observation to clear stop-work and restart decisions helps maintain an orderly operation.<\/p>\n<ul>\n<li><strong>Milestone date:<\/strong> October 4, 2023<\/li>\n<li><strong>Installed component:<\/strong> First main-line steel cross girder for Lot 6<\/li>\n<li><strong>Primary lifting equipment:<\/strong> 400-ton crawler crane<\/li>\n<li><strong>Reported operation time:<\/strong> Nearly two hours<\/li>\n<li><strong>Planning methods:<\/strong> Specialist technical reviews, lift rehearsals and BIM-based simulation<\/li>\n<li><strong>Related work fronts:<\/strong> Left carriageway and A and B ramp sections<\/li>\n<\/ul>\n<h2>Coordination in a multi-interface transport project<\/h2>\n<p>Work around a major station is rarely isolated. Municipal roads, ramps, structural interfaces, station systems and access arrangements must progress within a shared site environment. Starting the main-line girder sequence therefore required more than lifting capacity. It depended on approved work zones, stable access for heavy equipment, coordinated survey control, defined exclusion areas and timely communication among the participating contractors.<\/p>\n<p>For engineering buyers and project owners, this milestone illustrates the value of selecting a contractor that can combine structural fabrication knowledge with erection planning and field coordination. A component may be manufactured to drawing, but successful delivery also depends on how transport, crane selection, temporary works, geometric control and site constraints are integrated into one method statement.<\/p>\n<h2>Procurement value for complex steelwork packages<\/h2>\n<p>Buyers evaluating steel bridge or municipal infrastructure suppliers can draw several practical lessons from this operation. First, constructability should be considered early. Girder segmentation, lifting points, delivery routes and crane standing positions can influence both shop detailing and site productivity. Second, digital models are most useful when connected to field decisions rather than treated only as presentation material. Third, the first lift should be managed as a learning milestone, with observations recorded and incorporated into subsequent work.<\/p>\n<p>A robust procurement review should also look beyond nominal crane capacity. Relevant questions include how the supplier controls dimensional interfaces, manages revisions, verifies component identification, coordinates lifting accessories and responds to weather or access changes. Evidence of review routines and clear responsibility at each handover can be as important as equipment specifications.<\/p>\n<h2>Engineering management significance<\/h2>\n<p>The October 2023 lift provided an initial reference for the following steel box girder activities on Lot 6. It showed how technical reviews, simulation and real-time site controls could be brought together for a high-consequence operation. It also allowed the team to validate the planned workflow in practice and identify adjustments for later work fronts without claiming results beyond those documented in the original report.<\/p>\n<p>For companies planning comparable bridge, ramp or transport-hub packages, early coordination between design, fabrication and erection teams can reduce interface risk and improve decision speed on site. To discuss steel structure delivery, erection planning or a project-specific procurement requirement, please <a href=\"\/ar\/contact-us\/\">\u0627\u062a\u0635\u0644 \u0628\u0646\u0627<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>The first main-line steel cross girder on Guangzhou Baiyun Municipal Lot 6 was placed on October 4, 2023. The lift marked the start of the lot\u2019s steel box girder erection stage and demonstrated the planning, coordination and site controls required for complex work near a major transport hub.<\/p>","protected":false},"author":1,"featured_media":1250,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1],"tags":[93,157,155,158,156],"class_list":["post-1253","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","tag-bim","tag-bridge-construction","tag-company-news","tag-guangzhou-baiyun","tag-steel-box-girder"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Guangzhou Baiyun Lot 6 Steel Box Girder Erection Began<\/title>\n<meta name=\"description\" content=\"In October 2023, the first main-line steel cross girder was lifted into position on Guangzhou Baiyun Municipal Lot 6, opening the next construction stage.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zhfsteelgroup.com\/ar\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guangzhou Baiyun Lot 6 Steel Box Girder Erection Began\" \/>\n<meta property=\"og:description\" content=\"In October 2023, the first main-line steel cross girder was lifted into position on Guangzhou Baiyun Municipal Lot 6, opening the next construction stage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zhfsteelgroup.com\/ar\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/\" \/>\n<meta property=\"og:site_name\" content=\"Zhonghengfeng Steel Structure\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-04T15:12:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T05:40:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/guangzhou-baiyun-lot-6-steel-girder-lift.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"811\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Li Tao\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"Li Tao\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/\"},\"author\":{\"name\":\"Li Tao\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\"},\"headline\":\"Main-Line Steel Box Girder Erection Began on Guangzhou Baiyun Municipal Lot 6\",\"datePublished\":\"2023-10-04T15:12:00+00:00\",\"dateModified\":\"2026-10-22T05:40:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/\"},\"wordCount\":841,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/guangzhou-baiyun-lot-6-steel-girder-lift.webp\",\"keywords\":[\"BIM\",\"Bridge Construction\",\"Company News\",\"Guangzhou Baiyun\",\"Steel Box Girder\"],\"articleSection\":[\"Company News\"],\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/\",\"name\":\"Guangzhou Baiyun Lot 6 Steel Box Girder Erection Began\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/guangzhou-baiyun-lot-6-steel-girder-lift.webp\",\"datePublished\":\"2023-10-04T15:12:00+00:00\",\"dateModified\":\"2026-10-22T05:40:04+00:00\",\"description\":\"In October 2023, the first main-line steel cross girder was lifted into position on Guangzhou Baiyun Municipal Lot 6, opening the next construction stage.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/#primaryimage\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/guangzhou-baiyun-lot-6-steel-girder-lift.webp\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/guangzhou-baiyun-lot-6-steel-girder-lift.webp\",\"width\":1080,\"height\":811,\"caption\":\"A crawler crane lifts the first main-line steel cross girder on Guangzhou Baiyun Municipal Lot 6 in October 2023.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Main-Line Steel Box Girder Erection Began on Guangzhou Baiyun Municipal Lot 6\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"name\":\"Zhonghengfeng Steel Structure\",\"description\":\"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.\",\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zhfsteelgroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\",\"name\":\"Zhong Heng Feng Building Group Co., Ltd.\",\"alternateName\":\"ZHF Group\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"width\":822,\"height\":709,\"caption\":\"Zhong Heng Feng Building Group Co., Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/zhonghengfeng-construction-group-co-ltd\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\",\"name\":\"Li Tao\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"caption\":\"Li Tao\"},\"description\":\"Steel Structure Expert, China.\",\"sameAs\":[\"http:\\\/\\\/zhfsteelgroup.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Guangzhou Baiyun Lot 6 Steel Box Girder Erection Began","description":"In October 2023, the first main-line steel cross girder was lifted into position on Guangzhou Baiyun Municipal Lot 6, opening the next construction stage.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zhfsteelgroup.com\/ar\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/","og_locale":"ar_AR","og_type":"article","og_title":"Guangzhou Baiyun Lot 6 Steel Box Girder Erection Began","og_description":"In October 2023, the first main-line steel cross girder was lifted into position on Guangzhou Baiyun Municipal Lot 6, opening the next construction stage.","og_url":"https:\/\/zhfsteelgroup.com\/ar\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/","og_site_name":"Zhonghengfeng Steel Structure","article_published_time":"2023-10-04T15:12:00+00:00","article_modified_time":"2026-10-22T05:40:04+00:00","og_image":[{"width":1080,"height":811,"url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/guangzhou-baiyun-lot-6-steel-girder-lift.webp","type":"image\/webp"}],"author":"Li Tao","twitter_card":"summary_large_image","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"Li Tao","\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"4 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/#article","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/"},"author":{"name":"Li Tao","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825"},"headline":"Main-Line Steel Box Girder Erection Began on Guangzhou Baiyun Municipal Lot 6","datePublished":"2023-10-04T15:12:00+00:00","dateModified":"2026-10-22T05:40:04+00:00","mainEntityOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/"},"wordCount":841,"commentCount":0,"publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/guangzhou-baiyun-lot-6-steel-girder-lift.webp","keywords":["BIM","Bridge Construction","Company News","Guangzhou Baiyun","Steel Box Girder"],"articleSection":["Company News"],"inLanguage":"ar","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/","url":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/","name":"Guangzhou Baiyun Lot 6 Steel Box Girder Erection Began","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/#primaryimage"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/guangzhou-baiyun-lot-6-steel-girder-lift.webp","datePublished":"2023-10-04T15:12:00+00:00","dateModified":"2026-10-22T05:40:04+00:00","description":"In October 2023, the first main-line steel cross girder was lifted into position on Guangzhou Baiyun Municipal Lot 6, opening the next construction stage.","breadcrumb":{"@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/#primaryimage","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/guangzhou-baiyun-lot-6-steel-girder-lift.webp","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/guangzhou-baiyun-lot-6-steel-girder-lift.webp","width":1080,"height":811,"caption":"A crawler crane lifts the first main-line steel cross girder on Guangzhou Baiyun Municipal Lot 6 in October 2023."},{"@type":"BreadcrumbList","@id":"https:\/\/zhfsteelgroup.com\/guangzhou-baiyun-municipal-lot-6-steel-box-girder-erection\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/zhfsteelgroup.com\/"},{"@type":"ListItem","position":2,"name":"Main-Line Steel Box Girder Erection Began on Guangzhou Baiyun Municipal Lot 6"}]},{"@type":"WebSite","@id":"https:\/\/zhfsteelgroup.com\/#website","url":"https:\/\/zhfsteelgroup.com\/","name":"Zhonghengfeng Steel Structure","description":"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.","publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zhfsteelgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/zhfsteelgroup.com\/#organization","name":"Zhong Heng Feng Building Group Co., Ltd.","alternateName":"ZHF Group","url":"https:\/\/zhfsteelgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","width":822,"height":709,"caption":"Zhong Heng Feng Building Group Co., Ltd."},"image":{"@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/zhonghengfeng-construction-group-co-ltd\/"]},{"@type":"Person","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825","name":"\u0644\u064a \u062a\u0627\u0648","image":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","caption":"Li Tao"},"description":"Steel Structure Expert, China.","sameAs":["http:\/\/zhfsteelgroup.com"]}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/guangzhou-baiyun-lot-6-steel-girder-lift.webp","_links":{"self":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1253","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/comments?post=1253"}],"version-history":[{"count":1,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1253\/revisions"}],"predecessor-version":[{"id":1256,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1253\/revisions\/1256"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media\/1250"}],"wp:attachment":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media?parent=1253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/categories?post=1253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/tags?post=1253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}