{"id":1221,"date":"2026-10-21T20:22:03","date_gmt":"2026-10-22T04:22:03","guid":{"rendered":"https:\/\/zhfsteelgroup.com\/?p=1221"},"modified":"2026-10-21T21:13:42","modified_gmt":"2026-10-22T05:13:42","slug":"structural-steel-traceability-heat-number-data-book","status":"publish","type":"post","link":"https:\/\/zhfsteelgroup.com\/ar\/structural-steel-traceability-heat-number-data-book\/","title":{"rendered":"Structural Steel Traceability for Export Projects: From Heat Number to Data Book"},"content":{"rendered":"<p>Good workmanship is essential, but export structural steel is often accepted through documented evidence before the buyer sees the finished components. The reviewer may ask: Which heat produced this plate? Which approved procedure governed this weld? Was the welder qualified for the process and position? Where is the inspection report, and was a repair re-examined?<\/p>\n<p><strong>Structural steel traceability<\/strong> provides those answers through a connected record chain. The exact contractual framework varies\u2014projects may reference EN, AWS\/AISC, ISO or other national requirements\u2014so the contract, drawings, specifications and approved quality plan remain the controlling documents. The principles below are broadly useful without assuming any single certification route.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/structural-steel-material-traceability.webp\" alt=\"Inspector scanning a marked structural steel component while reviewing material and inspection records on a tablet.\"><figcaption>Illustrative traceability workflow linking component identity with material, fabrication and inspection records.<\/figcaption><\/figure>\n<h2>Start with an approved inspection strategy<\/h2>\n<p>An inspection and test plan (ITP) should be agreed before production. It identifies operations, acceptance criteria, records, responsible parties and intervention points. A hold point normally prevents work from proceeding without release; a witness point requires notice and gives the designated party the opportunity to attend; a review point requires specified documents to be checked.<\/p>\n<p>Terms and notice periods must be defined contractually. Missing a required notification can invalidate otherwise acceptable work or force additional verification. Production planning should therefore include inspection lead times and the availability of the owner, consultant or third-party inspector.<\/p>\n<div style=\"max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;\">\n<table style=\"width:100%;table-layout:fixed;overflow-wrap:anywhere;word-break:break-word;\">\n<thead>\n<tr>\n<th>Stage<\/th>\n<th>Identity to preserve<\/th>\n<th>Typical evidence<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Material receipt<\/td>\n<td>Grade, heat or cast, plate\/section, supplier batch<\/td>\n<td>Certificate, receiving inspection, purchase and delivery records<\/td>\n<\/tr>\n<tr>\n<td>Cutting<\/td>\n<td>Parent material to individual part<\/td>\n<td>Cut plan, transferred mark, parts list<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0644\u062d\u0627\u0645<\/td>\n<td>Joint, welder\/operator and procedure<\/td>\n<td>Weld map, qualification, WPS and production record<\/td>\n<\/tr>\n<tr>\n<td>Inspection<\/td>\n<td>Location and acceptance status<\/td>\n<td>Visual\/NDT report, instrument and personnel details<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0637\u0644\u0627\u0621<\/td>\n<td>Component, system and inspection lot<\/td>\n<td>Batch records, surface-preparation and DFT reports<\/td>\n<\/tr>\n<tr>\n<td>Dispatch<\/td>\n<td>Component to package and shipment<\/td>\n<td>Packing list, release note and container record<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>Material traceability: protect the heat-number link<\/h2>\n<p>At receipt, the team should reconcile the purchase specification, delivery documentation, material certificate and physical markings. Depending on the contract, an EN 10204 inspection certificate or another specified certificate type may be required. The certificate type must be confirmed by the purchaser; it should not be inferred after steel has arrived.<\/p>\n<p>The vulnerable moment is cutting. Once a plate is divided, its original stamp may remain on only one piece. A controlled marking-transfer method must link every relevant part and remnant to the parent heat or batch. The method may use durable marks, labels or digital records, provided it remains legible through the required process and does not damage the material.<\/p>\n<ul>\n<li>Quarantine unidentified or nonconforming material.<\/li>\n<li>Separate grades and heats where mix-up is possible.<\/li>\n<li>Record substitution approval before use.<\/li>\n<li>Control consumables by classification, batch and storage condition.<\/li>\n<li>Re-identify usable remnants before they return to stock.<\/li>\n<\/ul>\n<h2>Weld traceability: connect people, procedure and location<\/h2>\n<p>A certificate in a file does not prove that a qualified person made a particular weld. The project needs a weld identification method\u2014often a weld map or joint register\u2014that links each controlled joint to the applicable welding procedure specification (WPS), welder or operator, inspection method and result.<\/p>\n<p>Qualification ranges matter. Welding process, product type, material group, thickness, diameter and position may affect whether a qualification covers the work. Quality personnel should verify coverage against the governing code and project specification before assignment, not during final dossier review.<\/p>\n<p>Inspection reports must identify the exact weld or examination area. Generic descriptions create ambiguity, especially when several similar assemblies exist. Consistent drawing references, member marks and weld numbers make the reports searchable and defensible.<\/p>\n<h2>Repairs must remain visible in the record<\/h2>\n<p>Repair is not automatically evidence of a failed quality system; hidden or uncontrolled repair is. When a discontinuity requires correction, the record should identify the original joint, defect location, disposition authority, approved repair method, person performing the repair and post-repair examination.<\/p>\n<p>Repeated repairs may trigger additional engineering or quality approval under the applicable specification. Teams should never assume a universal number of permitted cycles. The governing code, client requirements and approved procedure determine the rule.<\/p>\n<h2>Unique component identity supports the entire chain<\/h2>\n<p>A durable component mark can connect shop activity to the final structure. Numbering should be unique, stable and understandable within the project. Barcodes or QR codes may speed data capture, but the technology is secondary to data governance: scans must call up approved, current records and preserve revision history.<\/p>\n<p>At minimum, the system should relate the component to material lots, drawings, fabrication status, inspections, coating lot, packing unit and shipping documents. Access controls and backups are necessary because a digital record that can be overwritten without audit is not strong evidence.<\/p>\n<h2>Build the data book during production<\/h2>\n<p>The manufacturing record book\u2014or data book\u2014should grow with the work. Waiting until dispatch to assemble thousands of pages leads to missing signatures, inconsistent numbering and reports that cannot be matched to components. A document index and turnover schedule should be approved early.<\/p>\n<p>Typical sections may cover approved procedures and personnel qualifications, material certificates, receiving records, dimensional reports, welding and NDT records, nonconformance and repair records, coating inspections, calibration evidence, packing lists and release certificates. The exact contents must follow the purchase order.<\/p>\n<h2>Buyer-side questions that reveal system maturity<\/h2>\n<ul>\n<li>How is identity transferred when plate or section is cut?<\/li>\n<li>Can one finished member be traced to its material certificate within minutes?<\/li>\n<li>How does the weld map link to WPS, welder and NDT report?<\/li>\n<li>Who sends hold\/witness-point notifications and tracks release?<\/li>\n<li>How are repairs, concessions and re-inspection recorded?<\/li>\n<li>Is turnover documentation reviewed by shipment lot?<\/li>\n<\/ul>\n<p>A practical implementation can begin with three controls: reliable material identification transfer, weld-to-welder mapping and complete repair records. These foundations support more advanced digital systems later. For a discussion about traceability expectations, inspection records or documentation for a steel package, please <a href=\"\/ar\/contact-us\/\">\u0627\u062a\u0635\u0644 \u0628\u0646\u0627<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Traceability turns fabrication records into a connected chain of evidence\u2014from incoming steel and weld identity to inspection release, packing and final turnover documentation.<\/p>","protected":false},"author":1,"featured_media":1208,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[32],"tags":[108,107,105,27,104,106],"class_list":["post-1221","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-expert-perspectives","tag-data-book","tag-inspection-and-test-plan","tag-material-certificates","tag-quality-control","tag-steel-traceability","tag-welding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Structural Steel Traceability: Heat Number to Data Book<\/title>\n<meta name=\"description\" content=\"A practical guide to structural steel traceability covering material certificates, weld mapping, ITP points, repairs, component IDs and data books.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zhfsteelgroup.com\/ar\/structural-steel-traceability-heat-number-data-book\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Structural Steel Traceability: Heat Number to Data Book\" \/>\n<meta property=\"og:description\" content=\"A practical guide to structural steel traceability covering material certificates, weld mapping, ITP points, repairs, component IDs and data books.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zhfsteelgroup.com\/ar\/structural-steel-traceability-heat-number-data-book\/\" \/>\n<meta property=\"og:site_name\" content=\"Zhonghengfeng Steel Structure\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T04:22:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T05:13:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/structural-steel-material-traceability.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1350\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Li Tao\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"Li Tao\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/\"},\"author\":{\"name\":\"Li Tao\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\"},\"headline\":\"Structural Steel Traceability for Export Projects: From Heat Number to Data Book\",\"datePublished\":\"2026-10-22T04:22:03+00:00\",\"dateModified\":\"2026-10-22T05:13:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/\"},\"wordCount\":971,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/structural-steel-material-traceability.webp\",\"keywords\":[\"Data Book\",\"Inspection and Test Plan\",\"Material Certificates\",\"quality-control\",\"Steel Traceability\",\"Welding\"],\"articleSection\":[\"Expert Perspectives\"],\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/\",\"name\":\"Structural Steel Traceability: Heat Number to Data Book\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/structural-steel-material-traceability.webp\",\"datePublished\":\"2026-10-22T04:22:03+00:00\",\"dateModified\":\"2026-10-22T05:13:42+00:00\",\"description\":\"A practical guide to structural steel traceability covering material certificates, weld mapping, ITP points, repairs, component IDs and data books.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/#primaryimage\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/structural-steel-material-traceability.webp\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/structural-steel-material-traceability.webp\",\"width\":1350,\"height\":900,\"caption\":\"Illustrative traceability workflow linking component identity with material, fabrication and inspection records.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/structural-steel-traceability-heat-number-data-book\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Structural Steel Traceability for Export Projects: From Heat Number to Data Book\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#website\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"name\":\"Zhonghengfeng Steel Structure\",\"description\":\"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.\",\"publisher\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zhfsteelgroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#organization\",\"name\":\"Zhong Heng Feng Building Group Co., Ltd.\",\"alternateName\":\"ZHF Group\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"contentUrl\":\"https:\\\/\\\/zhfsteelgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png\",\"width\":822,\"height\":709,\"caption\":\"Zhong Heng Feng Building Group Co., Ltd.\"},\"image\":{\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/zhonghengfeng-construction-group-co-ltd\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/zhfsteelgroup.com\\\/#\\\/schema\\\/person\\\/fcc1d92a78fea5db9c6bbbf5aa281825\",\"name\":\"Li Tao\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g\",\"caption\":\"Li Tao\"},\"description\":\"Steel Structure Expert, China.\",\"sameAs\":[\"http:\\\/\\\/zhfsteelgroup.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Structural Steel Traceability: Heat Number to Data Book","description":"A practical guide to structural steel traceability covering material certificates, weld mapping, ITP points, repairs, component IDs and data books.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zhfsteelgroup.com\/ar\/structural-steel-traceability-heat-number-data-book\/","og_locale":"ar_AR","og_type":"article","og_title":"Structural Steel Traceability: Heat Number to Data Book","og_description":"A practical guide to structural steel traceability covering material certificates, weld mapping, ITP points, repairs, component IDs and data books.","og_url":"https:\/\/zhfsteelgroup.com\/ar\/structural-steel-traceability-heat-number-data-book\/","og_site_name":"Zhonghengfeng Steel Structure","article_published_time":"2026-10-22T04:22:03+00:00","article_modified_time":"2026-10-22T05:13:42+00:00","og_image":[{"width":1350,"height":900,"url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/structural-steel-material-traceability.webp","type":"image\/webp"}],"author":"Li Tao","twitter_card":"summary_large_image","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"Li Tao","\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"5 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/#article","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/"},"author":{"name":"Li Tao","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825"},"headline":"Structural Steel Traceability for Export Projects: From Heat Number to Data Book","datePublished":"2026-10-22T04:22:03+00:00","dateModified":"2026-10-22T05:13:42+00:00","mainEntityOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/"},"wordCount":971,"commentCount":0,"publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/structural-steel-material-traceability.webp","keywords":["Data Book","Inspection and Test Plan","Material Certificates","quality-control","Steel Traceability","Welding"],"articleSection":["Expert Perspectives"],"inLanguage":"ar","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/","url":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/","name":"Structural Steel Traceability: Heat Number to Data Book","isPartOf":{"@id":"https:\/\/zhfsteelgroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/#primaryimage"},"image":{"@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/#primaryimage"},"thumbnailUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/structural-steel-material-traceability.webp","datePublished":"2026-10-22T04:22:03+00:00","dateModified":"2026-10-22T05:13:42+00:00","description":"A practical guide to structural steel traceability covering material certificates, weld mapping, ITP points, repairs, component IDs and data books.","breadcrumb":{"@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/#primaryimage","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/structural-steel-material-traceability.webp","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/structural-steel-material-traceability.webp","width":1350,"height":900,"caption":"Illustrative traceability workflow linking component identity with material, fabrication and inspection records."},{"@type":"BreadcrumbList","@id":"https:\/\/zhfsteelgroup.com\/structural-steel-traceability-heat-number-data-book\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/zhfsteelgroup.com\/"},{"@type":"ListItem","position":2,"name":"Structural Steel Traceability for Export Projects: From Heat Number to Data Book"}]},{"@type":"WebSite","@id":"https:\/\/zhfsteelgroup.com\/#website","url":"https:\/\/zhfsteelgroup.com\/","name":"Zhonghengfeng Steel Structure","description":"Zhonghengfeng is a China-based steel structure manufacturer. Core product groups: Steel Structures for Industrial Plants; Steel Structures for Warehousing and Logistics; Steel Structures for Heavy Industry; Multi-Storey Steel Frames; Large-Span Steel Structures. Domestic China scope includes EPC and installation contracting. Overseas services: Engineering coordination, detailing, factory fabrication, export delivery, and remote or on-site installation technical guidance. Overseas EPC and installation contracting are not included.","publisher":{"@id":"https:\/\/zhfsteelgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zhfsteelgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/zhfsteelgroup.com\/#organization","name":"Zhong Heng Feng Building Group Co., Ltd.","alternateName":"ZHF Group","url":"https:\/\/zhfsteelgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","contentUrl":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/09\/cropped-\u4e2d\u6052\u4e30logo_\u7ad6\u7248_\u900f\u660e\u80cc\u666f.png","width":822,"height":709,"caption":"Zhong Heng Feng Building Group Co., Ltd."},"image":{"@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/zhonghengfeng-construction-group-co-ltd\/"]},{"@type":"Person","@id":"https:\/\/zhfsteelgroup.com\/#\/schema\/person\/fcc1d92a78fea5db9c6bbbf5aa281825","name":"\u0644\u064a \u062a\u0627\u0648","image":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f8a31ccd2237d76d1b54502e2963e1c9dc98e3e4bceb16a55572d5001352bde1?s=96&d=mm&r=g","caption":"Li Tao"},"description":"Steel Structure Expert, China.","sameAs":["http:\/\/zhfsteelgroup.com"]}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/zhfsteelgroup.com\/wp-content\/uploads\/2026\/10\/structural-steel-material-traceability.webp","_links":{"self":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1221","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/comments?post=1221"}],"version-history":[{"count":2,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1221\/revisions"}],"predecessor-version":[{"id":1247,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/posts\/1221\/revisions\/1247"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media\/1208"}],"wp:attachment":[{"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/media?parent=1221"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/categories?post=1221"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zhfsteelgroup.com\/ar\/wp-json\/wp\/v2\/tags?post=1221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}